My client purchased four robots to milk cows 24/7. At the start of the project, I asked the OEM - “How quickly will the robots reboot/reset after an outage? You should know that we get outages all the time and that we get voltage swings with all the PV”. OEM - No answer. It was then decided to install two 10kVA UPS systems to fill the gap between an outage and the backup diesel generator supporting the customer’s load. Fuseco, a specialist in this area, were a great help in producing a solution for the split phase 480VAC system.
Peter Bulle
Director at CoGen Plus
Dealing with your team has been a very positive experience. The Continuum UPS solutions in conjunction with your professional advice solved our Demand Load Management challenges perfectly.
Frank Leonis
Project Engineer at SMEC
Reliable continuity of supply has been an issue for this project from its inception. The Continuum solutions implemented here have solved this issue and have given us peace of mind. Thank you guys for your patience, expertise and support.
Lawrence Cheng
Engineering Manager at ARUP